Stainless steel pipe is used for transporting liquids and gasses in a wide range of industries including mining, oil, natural gas, automotive, and aviation. Geepro carries a wide range of stainless steel pipe schedules: 304 Sched. 5, 304 Sched. 10, 304 Sched. 40, 304 Sched. 80, 316 Sched. 10, 316 Schedule 40, and 316 Sched. 80.
Stainless steel pipe is a kind of pipe that is used more often. Generally, in order to ensure the quality of the product, we need to carry out welding operation before use. It is very important to master the correct operation method, which is also beneficial to our later use. Yes, let's take a look at what stainless steel pipes need to be prepared before welding:
1. In order to ensure the safety of the staff, when welding the product, it is very important for the staff to wear professional work clothes and do a good job of protection.
2. Before using the electric grinding tool, it is necessary to check whether the grinding wheel is loose and whether the grinding wheel needs to be replaced.
3. Safety belts should be worn when the stainless steel pipe is working at heights, and the scaffolding should be safe and reliable.
4. If there are flammable and explosive objects below when working at heights, measures should be taken in advance to prevent splashes from falling.
5. The welding wire shall not be connected with the equipment with the induction coil, and the part connected with the welding tongs shall be placed reliably to avoid the arc damage to the steel pipe during operation.